Electronic Components Datasheet Search |
|
B24-1B10-CKP Datasheet(PDF) 4 Page - Magnetrol International, Inc. |
|
B24-1B10-CKP Datasheet(HTML) 4 Page - Magnetrol International, Inc. |
4 / 36 page 4 46-630 Boiler External Cage Liquid Level Switches Optional blow-down or drain valve Shutoff valve (if used) Conduit outlet Switch actuating level reference mark Optional liquid leg connection to vessel Shutoff valve (if used) Figure 1 Typical Piping Arrangement 1.0 Installation Caution: If equipment is used in a manner not specified by manufacturer, protection provided by equipment may be impaired. 1.1 Unpacking Unpack the instrument carefully. Inspect all units for damage. Report any concealed damage to carrier within 24 hours. Check the contents against the packing slip and purchase order. Check and record the serial number for future reference when ordering parts. Caution: Do not discard the shipping container until all parts are accounted for. 1.2 Critical alarm function NOTE: Confirm that the installed unit meets the criteria of the intend- ed application. The most critical parameters are the pressure, temperature, and specific gravity. If there is a question or con- flict between actual parameters and the Magnetrol switch nameplate, contact Magnetrol for information on the level control (please have the serial number available). It is recommended that for critical alarm functions, an additional level switch be installed as a high–high or low–low level alarm for maximum protection. 1.3 Piping An instruction tag secured to the control gives dimensional data on switch actuating levels referenced from center line of upper side tank connection. Position control so that actuating levels correspond with the desired liquid level trip points in the boiler. Caution: Refer to boiler manufacturer’s specifications regarding control levels for piping alignment requirements. Use pipe of sufficient strength to support the control. If necessary, provide a stand or hanger to help support its weight. All piping should be straight and free of “low spots” or “pockets” so that lower liquid line will drain towards the boiler and upper vapor line will drain toward the control. Shut-off valves are recommended for installation between the boiler and the control. Refer to Figure 1. If control is to be used with a low temperature liquid (one which will “boil” in the float chamber if outside heat is absorbed), |
Similar Part No. - B24-1B10-CKP |
|
Similar Description - B24-1B10-CKP |
|
|
Link URL |
Privacy Policy |
ALLDATASHEET.NET |
Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
Family Site : ic2ic.com |
icmetro.com |