Electronic Components Datasheet Search |
|
F50-1A2F-JEE Datasheet(PDF) 11 Page - Magnetrol International, Inc. |
|
F50-1A2F-JEE Datasheet(HTML) 11 Page - Magnetrol International, Inc. |
11 / 28 page 47-602 F10 and F50 Flow Switches 11 NOTE: As a matter of good practice, spare switches should be kept on hand at all times. 3.1.3 Inspect Entire Unit Periodically Increase and decrease liquid flow through the pipeline to check for switch contact and reset. 3.2 What To Avoid 1. NEVER leave switch housing cover off the control longer than necessary to make routine inspection. 2. NEVER place a jumper wire across terminals to cut-out the control. If a jumper is necessary for test purposes, be certain it is removed before placing control into service. 3. NEVER attempt to make adjustments or replace switches without reading instructions carefully. Certain adjustments provided for in flow switches should not be attempted in the field. When in doubt, consult the factory or your local representative. 4. NEVER use lubricants on pivots of switch mechanisms. A sufficient amount of lubricant has been applied at the factory to ensure a lifetime of service. Further lubrication is unnecessary, and will only tend to attract dust and dirt which can interfere with mechanism operation. |
Similar Part No. - F50-1A2F-JEE |
|
Similar Description - F50-1A2F-JEE |
|
|
Link URL |
Privacy Policy |
ALLDATASHEET.NET |
Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
Family Site : ic2ic.com |
icmetro.com |